page-header

Projects

Ongoing and Completed Projects by Us

  • Construction of 6-lane access controlled Greenfield highway from km 115+000 to km 140+000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH- 754K as a part of Amritsar-Jamnagar Economic Corridor under Bharatmala Pariyojana (Phase-I) in the State of Rajasthan (AJ/SR-Package-5); Client: Raj Shyama Constructions Pvt Ltd.
  • Construction of 6-lane access controlled Greenfield highway from km 225+000 to km 252+500 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-9); Client: Raj Shyama Constructions Pvt Ltd.
  • Four Laning of the Suryapet (Design Km. 0.420/Existing Km. 128.500 of NH-65) to Khammam (Design Km. Ch.59.046/Existing Km. 50.750 of old SH42) of NH-365BB (Old SH-42) (Design Length = 58.626 Km) in the state of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode. Client: ADANI TRANSPORT LIMITED
  • Construction of viaduct and approach at level crossing 30 (ROB) at Patna Sachivalaya Halt Mithapur – Anishabad- Khagaul Road (MDR) in Patna district. Client: Bihar Rajya Pul Nirman Nigam Ltd
  • Construction of Eight Lane Expressway Starting At Ch.47+000 Near Khanpur Ghati And Ends At Haryana-Rajasthan Border (Km 47+000 Km78+800) Section Of Delhi-Vadodara Green Field Alignment (Nh-148n) Under Bharatmala Pariyojana In State Of Haryana.
    Client: Centrodorstroy India Private Limited
  • Improvement to Roads joining District place in Amravati District. (Warud – Gavankund – Bahada – Jarud – Mangruli – Kachurna – Haturna and Morshi – Pala  –  Salbardi – Dongaryavali – Dapori) (MDR- 66,MDR-45). Length – 46.305 Km,Pkg9;
    Client: Welspun Enterprises Ltd.
  • Widening and Strenghthening/ Reconstruction Of Existing 2-Lane To 2-Lane With Paved Shoulder Configuration From Existing Km 235.615 (Design Km 235.30) To Km 268.100) Of Nh-58 Iin The State Of Uttarakhand Through An Engineering Procurement And Construction (Epc) Contract.
    Client: Raj Shyama Constructions Pvt Ltd.
  • Development & Maintenance Of Jodhpur-Sojat Section Of Sh-58 (Length: 75.91km) And Bhinmal-Pantheri – Posana – Jeevana (Length 51.58 Km)
    Client: Radhe Krishna Construction
  • Design and Drawing including approach span of ROB at Km. 18+653 for the project of Four Laning of Gundugolanu – Devarapalli – Kovvuru Section of NH-16 (Old SH-107) from Design Ch. 15+320 (Existing Km. 15+700) to Design Ch. 85+204 (Existing Km 81+400) in the State of Andhra Pradesh on Hybrid Annuity Mode.
    Client: G R Infraprojects Ltd.
  • Construction of 3 lane flyover on Guru Govind Singh Marg from Hussainganj Chauraha-Bansmandi Chauraha-Naka Hindola Chauraha to DAV College in Distt-Lucknow.
    Client: U.P.STATE BRIDGE CORPORATION Ltd.
  • Improvement to Amravati Chandur Railway Dhamangaon Road in Amravati Dist. Joining Chandur Railway & Dhamangaon Taluka HQ to Amravati Dist. HQ  (SH 297& 296). Length – 49.7 Km,Pkg7;
    Client: Welspun Enterprises Ltd.
  • Improvement to Amravati-Bhatkuli-Asara Road joining Bhatkuli Taluka HQ to Amravati District HQ of (SH-280). Length – 28.92 Km,Pkg6;
    Client: Welspun Enterprises Ltd.
  • Improvement to Amravati Mardi Kurha Kaundynapur up to District Border Road in Amravati District Joining Kaundynapur Holy place to Amravati Dist. HQ (SH 280, SH 300 & SH 294). Length – 39.70Km,Pkg5 ;
    Client: Welspun Enterprises Ltd.
  • Construction of viaduct and approach at level crossing 36 (ROB) at Danapur station Limit on Khagaul – Shivala – Naubatpur Road (MDR) in Patna district.”
    Client: Bihar Rajya Pul Nirman Nigam Ltd.
  • ”Construction of viaduct and approach at level crossing 33 (ROB) between Phulwarisharif and Danapur on Jagdeo Path (MDR) in Patna district.”
    Client: Bihar Rajya Pul Nirman Nigam Ltd
  • Construction of viaduct and approach at level crossing 30 (ROB) at Patna Sachivalaya Halt Mithapur – Anishabad- Khagaul Road (MDR) in Patna district.”
    Client: Bihar Rajya Pul Nirman Nigam Ltd
  • Muzafarnagar – Baraut;
    Client: RCC Developers Ltd.
  • Illam Bridge;
    Client: ROYAL INFRACONSTRUCTION LTD
  • Gwalior ROB.
    Client: Girrajji Stone Crushers
  • Highway Design Of  4 No.S Grade Separator In Km 281.00 To Km 307.600 (Km 286.400 Kumhari, Km 299.00 Transport Nagar, Km 302.00 Power House, Km 304.00 Chandra-Mourya Chowk To Km 305.00 Supela) Of Nh-53 Raipur-Durg 4-Lane, In Chhattisgarh;
    Client: ROYAL INFRACONSTRUCTION LTD
  • Rehabilitation and Up gradation from km 450+000 to km 486+775 of NH-76E (Tikri-Mirzapur) to Two lane with Paved Shoulder in the State of Uttar Pradesh on EPC Mode.
    Client: RCC Developers Ltd.
  • “Rehabilitation and up-gradation to Two Lane with paved shoulder of Punjab/Haryana Border to Moonak-Jakhal-Budhlada Bhiki from Km 236+600 to Km 239+480 (Design Km 236+600 to Km 239 +400) and Km 244+750 to Km 287+710 (Design Km 244+540 to Km 287+548) Section of NH-148B falling in the state of Punjab.”
    Client: Rajinder Infrastructure Private Limited
  • Up-gradation to two lane paved shoulder for section from Km 16+200 to Km 58+000 (excluding Km 21+700 to Km 24+350 and 42+700 to 50+600) Balotra to Sanderao via Jalore section of NH 325 in the State of Rajasthan on EPC mode – Package I”
    Client: Radhe Krishna Construction
  • Rehabilitation & Up gradation of Two lane flexible pavement to 2 lane with paved shoulders on Daboh- Bhander-UP Border Road from Daboh Bypass End to Bhander Bypass Start [Design km.40+230 to km 70+525] and Bhander Bypass End to U.P. Border [Design Km 76+900 to Km 89+860 ] (Excluding Daboh Bypass-Km 36+540 to Km 40+230 & Bhander Bypass-Km 70+525 to Km 76+900) Length 43.255 Km & White Topping (in Daboh and Bhander City of Km 4.370) section of newly declared NH-552 Ext. in the State of Madhya Pradesh.
    Client: SKS Infra Projects Pvt Ltd.
  • Rehabilitation & Up gradation of Two lane flexible pavement to 2 lane with paved shoulders on Mihona Bypass end to Lahar Bypass Start (Design Ch. Km 2.800 to Km 10.955) & Lahar Bypass End to Daboh Bypass Start (Design Ch. Km 17.335 to Km 36.540) (excluding bypasses from Km 0.000 to 2.800 & Km 10.955 to Km 17.335) length 27.36 Km. & White Topping (in Mihona and Lahar City of Km 6.335) section of newly declared NH-552 Ext. in the State of Madhya Pradesh on EPC Mode.
    Client: SKS Infra Projects Pvt Ltd.
  • Development & Upgradation of Banar – Bhopalgarh – Kuchera Highway (SH-63) km 0 to 126.500 under RSHDP-II (Package No WB/RSHDP II/EPC/01)
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Detailed Design Assignment 2. Development & Upgradation of Bhawi – Pipar – Khimsar Highway (SH-86C) Length 83.225 Km under RSHDP II (Package No WB/RSHDP II/EPC/ 02)
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Construction of two lane flexible payment with paved shoulders configuration from Km. 5/975 to 19/525 (Design Ch-7+400 to 20+925 =13.525 Km.) and Km. 26/825 to 41/200 (Design Ch-27+300 to 41+625 =14.325 Km.) total length 27.850 km of existing road for up gradation of Fatehpur to Jhunjhunu Section of NH-11 in the State of Rajasthan.
    Client: Tomar Construction Company
  • Detailed Design of structures of Talgaon-Kalmath section from km 198 to 218 and km 230 to 237.
    Client: KCC Buildcon Pvt. Ltd
  • Development, Operation and Maintenance of the Gadoj (State Border) –Majri to Haryana/Rajasthan Border and Majri to Neemrana (SI-IIII & SH III A).
    Client: BG Neemrana Rewari Linkway Pvt Ltd.
  • Work order for consultancy services for design of VUP with service road at two locations of project highway namely kankani (Km 332/200 to Km 333/100) and MDR 13 junction (Km 372/650 to Km 373/400)at jodhpur Pali Road Project and Approved under COS.
    Client: Jodhupr Pali Expressway Private Ltd.
  • FOUR- LANNING OF BHOPAL-BIAORA  SECTION OF NH -12 FROM LALGHATI KM. 324.400 TO BHOPAL BYPASS JUNCTION KM. 423.000 (PKG -II).
    Client: Centrodorstroy India Private Limited
  • Rehabilitation and upgradation of Watul to Talgaon section of NH-17 [New NH No. 66] from existing km 332/200 to km 367/200 in the State of Maharashtra to four-lanes. Client: KCC Buildcon Pvt. Ltd
  • Up-gradation to two lane with paved shoulder for section from Km 58.000 to Km 91.600 ( excluding ch (59.460 to 62.900), (73.120 to 75.920), (82.650 to 85.300)) Balotra to Sanderao via Jalore (excluding ongoing BOT Projects) section of NH 325 in the State of Rajasthan on EPC mode.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Designing of 1-Nos Caisson Foundation and barge for Construction of foundation and substructure of Important bridge No. (15x61m span) at km 41 in connection with construction of proposed 2nd bridge across river Kosi as part doubling between Katareah and Kursela in Barauni – Katihar section.
    Client: Naraindas Construction Pvt Ltd
  • RSHIP- Pkg II.
    Client:  Radhe Krishna Construction
  • Four Laning of Tarsod – Fagne Section of NH-6 from Km 422.700 to Km 510.000  in the State of Maharashtra.
    Client: Agroh Infrastructure & Developers Pvt Ltd
  • Consultancy Services for Preparation of Detailed Project Design Report for the Project “Reconstruction with geometrics improvement of existing Intermediate Lane to 2-lane with paved shoulder configuration from Km. 1.957 to Km. 28.600 excluding Narendra Nagar Bypass (Km. 13.800 to Km. 18.550) of NH-94 in the State of Uttarakhand on EPC Mode.
    Client: M.G. Contractors Pvt. Ltd.
  • RSHIP- Pkg 1.
    Client: Brij Gopal Construction Company Pvt. Ltd
  • Kabri-Banda.
    Client: Centrodorstroy India Private Limited
  • Mau-Jesra.
    Client: Centrodorstroy India Private Limited
  • Two-Lane with paved shoulder of Project Highway comprise the section of National Highway 2C commencing from N.H.-2 (Veerkunwar Singh Chowk, Dehri-on-sone) From Ch. -0.000 to 40.000 (Akbarpur, Rohtas).
    Client: M.G. Contractors Pvt. Ltd.
  • Detailed Design and Construction Engineering for PRE-CAST Segmental Construction proposed Ghaghara River Bridge in District Ballia.
    Client: U.P. State Bridge Corporation Limited
  • Rehabilitation and Up-gradation of from km 285.000 to 326.000 of NH-76 (Kalupur – Lalata Road) to two lane with paved shoulder on EPC mode in the state of Uttar Pradesh on Engineering , Procurement and Construction (EPC) Mode.
    Client: Centrodorstroy India Private Limited
  • Two Lane with Paved shoulder of Tonk- Sawaimadhopur Section of NH-116 from Km 1.300 to Km 69.750
    in the State of Rajasthan on EPC Mode.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Detailed Design & Drawing for “Widening and Strengthening of Existing Highway Section to Two-Laning with paved shoulder from km. 0.000 to km. 62.318 of Manoharpur – Dausa of NH-11A (New NH0148) in the State of Rajasthan on EPC basis.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Detailed Design for Pre-cast Segmental Construction of High Level Bridge across Chambal river on Ater – Jaitpur road at km. 3/8 to 4/8 (Ater Ghat) in District Bhind (M.P.).
    Client: Naraindas Construction Pvt Ltd
  • Two-lane with paved shoulder from km 1.300 to km 74.349 of Chhapra – Rewaghat-Muzaffarpur of NH-102 in the state of Bihar.
    Client: G R Infraprojects Ltd.
  • TWO LANING WITH PAVED SHOULDER OF CHHAPARA GOPALGANJ SECTION OF NH-85 IN THE STATE OF BIHAR ON EPC MODE.
    Client: G R Infraprojects Ltd.
  • Amritsar bypass.
    Client: VARAHA INFRA Ltd.
  • Preparation of Detailed Project Design Report for Four Laning of Kharar – Kurali Section of NH-21 from km 15.765 to km 29.900 (Existing Chainages) (New NH-205) (Total Length 13.700 km) in the State of Punjab on EPC Mode including Topographical Survey.
    Client: M.G. Contractors Pvt. Ltd.
  • Consultancy Services for Detailed Design and Construction of Ghaghara River Bridge at Dhemuwa Ghat on Nawabganj – Dhemuwa Road I Distt. Faizabad.
    Client: U.P. State Bridge Corporation Limited
  • Four Laning of Ghaghra Bridge to  Varanasi Section of NH-233 from km. 121.800 to km. 180.420 [Package-1 from Ghaghra Bridge Abutment on Basti side to Bhudanpur urban Section] in the State of Uttar Pradesh under NHDP Phase-IV on EPC Mode – Engineering, Procurement & Construction (EPC) Mode.
    Client: Infinite civil solutions pvt ltd
  • Widening and Strengthening of Existing Highway Section to Two-Laning with paved shoulder of Uncha-Nagla-Khanuawa-Roppas-Dholpur section of NH-123 in the State of Rajasthan/ Uttar Pradesh;
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Detailed Design for Rehabilitation & augmentation of Two Laning with paved shoulders of Gulabpura to Uniara section of NH-148d from km 69.267 (at junction of NH-79) to km 282’936 (at junction of NH-.l16) in the state of Rajasthan under NHDP Phase-lV on Engineering Procurement and Construction (EPC) mode.
    Client: Saraswati Construction Company
  • Detailed design & drawings for One ROB for Barmer Jaisalmer Road project;
    Client: G R Infraprojects Ltd.
  • Detailed design & drawings for two ROBs for Suratgarh Sriganganar Road project.
    Client: G R Infraprojects Ltd.
  • Consultancy services for feasibility cum detailed project report preparation for 4 lanning work from Kosi  Nandgaon  Barsana Govardhan Sonkh to Raya in district Mathura, Uttar Pradesh.
    Client: PWD-UP
  • 4 Lanning of Varanasi Bypass.
    Client: Pvt. Ltd.
  • Consultancy services for preparation of Detailed Design & Drawing for widening & strengthening from Km 1 to 47 (46.470) of NH-96(330) (Faizabad- Allahabad Road) Km 0+000 to Km 46+470.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Preparation and submission of detailed drawings for the Box / Pipe Culverts as per Revelent IRS, IS Codes, DFCC Specifications and accepted T&C.
    Client: L&T ECC
  • Consultancy Services for Preparation of Detailed Design & Drawing including Geo-technical Investigations for Two Laning with Paved Shoulders of Sitarganj – Tanakpur Section of NH-125 from KM 0.000 (KM 254.600 of NH-74) to KM 52.200 in the State of Uttarakhand under NHDP-IVB on Engineering Procurement & Construction (EPC) Basis.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Remedial Design for Slope Collapse of NH-1 at km. 111.700 for the Project Chenani-Nashri Tunnel.
    Client: SMEC India Pvt. Ltd.
  • Detailed Design and Drawing Consultancy Services including Soil Investigation for Construction of proposed stilted portion of ROB for Hi-Tech Sushant Golf City Township at Lucknow (U. P.)
    Client: Ansal Properties & Infrastructure Ltd.
  • Detailed design & drawings for two minor bridges & RCC drain of 1.5mx1.5m & 1.0×1.0 of amritsar PWD works
    Client: VARAHA INFRA Ltd.
  • Detailed Design for Rehabilitation & augmentation of Two Laning with paved shoulders of Gulabpura to Uniara section of NH-148d from km 69.267 (at junction of NH-79) to km 282’936 (at junction of NH-.l16) in the state of Rajasthan under NHDP Phase-lV on Engineering Procurement and Construction (EPC) mode.
    Client: H. G. Infra Engineering Pvt. Ltd.
  • Six Laning of Jalandhar- Amritsar section of NH-1 from km 387.100 to km 407.100 in the state of Punjab under NHDP Phase II on EPC Mode.
    Client: VARAHA INFRA Ltd.
  • Designing work of Trumpet at the junction of NH-71 & NH-8 in the Project of Four Laning of Rohtak-Bawal Section of NH-71 from Km 363+300 to 445+853 in the State of Haryana on DBFOT (Toll) under NHDP Phase-III.
    Client: Kurukshetra Expressway Private Limited
  • RSRDC Projects
    1.) Strengthening, Raising and Cement Concrete Pavement on Kota-Dharanwada Road (SH-51) from (I) Km 16/500 to Km 111/100 (Part-A) & (II) Km 70/00 to Km 111/00 (Part-B) including Toll Plaza Cannopy.
    2.) Development of Kishangarh Bas-Khairthal-Bansur-Kotputli Road from Km 0/0 to Km 27/500 (Package-1) & Km 27/500 to Km 62/000 (Package-2) of MDR-25.
    Client: Varaha Infra Ltd.
  • Consultancy services for detailed design and methodology of small bridges over different section of KNBG road ( Km 18,19 & 25) and over Mathura-Sonkh Road (Km 13) in distt. Mathura.
    Client: PWD-UP
  • Design of structures of widening & strengthening to two-lane with paved shoulders of Raipur – Jassa khera section of NH-458 (package-iii) from km 216.600 (existing chainage km 222.400) to km 248.960 (existing chainage km 257.105) (length 32.360 km)  in the state of rajasthan under NHDP phase-IV on Engineering Procurement and
    Construction (EPC) mode.
    Client: G R Infra projects Ltd.
  • Design of structures of  Widening & Strengthening to Two-Lane with paved shoulder of Lambia – Raipur Section of NH 458 from km 163.800 (Existing chainage km 168.280)  to km 216.600 (Existing chainage km 222.400) (Length 58.200 Km) in the state of Rajasthan under NHDP Phase – IV on Engineering Procurement and Construction (EPC) mode.
    Client: G R Infra projects Ltd.
  • Structural Design of Toll Plaza Building at Reengus and Administrative Block at Guwahati Emulsion Plant.
    Client: GR Infra projects Ltd.
  • Bridge design services for the project of “Consultancy for a Feasibility Report for High Level Bridge over river IB along with approach roads at Jharsuguda District in PPP mode”.
    Client: Voyants Solutions Pvt. Ltd.
  • 4 lanning / 4 lanning with PSS with dual carriageway configuration for Km 308.000 to Km 378.315 (Jodhpur – Pali Section including Pali Bypass) of NH-65 in Rajasthan State.
    Client: GR Infra projects Ltd.
  • Detailed Structure design works for 4 Laning of Yamunanagar-Pannchkula Section of NH-73 to be executed as BOT (Toll) Project on DBFO Pattern under NHDP Phase – III.
    Client: M/s Varaha Infra Ltd.
  • Salient feature: Design of structures in accordance to latest IRC 112 standard View Gallery Detailed design works for Two Laning with Paved Shoulder of Rajasthan Border to Fatehpur and Missing Link upto Salasar, section of NH 65 under NHDP Phase IV on DBFOT (Toll) basis in the State of Rajasthan.
    Client: M/s Galfar Engineering & Contracting SAOG (Galfar).
  • Detailed design works for 4/6 Laning of Rohtak – Bawal Section of NH-71 to be executed as BOT (Toll) Project on DBFO Pattern under NHDP Phase – III.
    Client: M/s Varaha Infra Ltd.
  • Detailed design & drawings for various flyovers/ROB of Ludhiana-Talwandi section of NH-95 to be executed as BOT (Toll) Project on DBFO Pattern under NHDP Phase – III.
    Client: M/s Varaha Infra Ltd. (EPC contractor)Concessionaire: Essel Infra Pvt. Ltd.
  • Salient feature: Design of ROB using Limit state in accordance to IRC 112. View Gallery
    Detailed design works for Four Laning of Ringus to Sikar of NH-11 from existing ch. Km 298.075(design km ch. 298.075) to existing ch. 341.027 (design ch. 43.887) on BOT project on DBFOT pattern under NHDP Phase III
    Client: M/s GR Infra Projects.
  • Detailed Engineering Design for 2-laning of Nechipu – Hoj section of NH-229 (311 KM) in the state of Arunachal Pradesh.
  • Consultancy Services for development of Detailed Project Reports for 2-Laning of Shillong Bypass connecting of NH-40 & NH-44 from Km 61/800 of NH-40 to Km 34/850 of NH-44 in the state of Meghalaya on DEFOT Pattern under SARDP-NE on BOT (Annuity Basis)
    Client : M/s GR Infra Projects
  • Detailed design works for four laning of Narketpally-Addanki-Medarametla road (SH-02) from km. 166+000 to km 212+500 in the State of Andhra Pradesh under Public Private Partnership (PPP) on Build, Operate and Transfer (BOT) basis in association with M/s V. R. Techniche Consulting Pvt. Ltd.
    Client: M/s RAMKY Infrastructures Ltd.
  • Design Review of Built ROB at Chainage 152+900.688 of Vadodra-Bharuch section of NH-8
    Client: L&T infrastructure development projects limited
  • Detailed design works for construction of Shillong Bypass connecting NH-40 and NH-44 from km. 61+800 of NH-40 to km. 34+850 of NH-44 in the State of Meghalaya.
    Client: M/s G. R. Infra Limited.
  • Detailed design works for construction of bridges in the State of Jharkhand in association with M/s HICON Consultants.
    Client: M/s ILFS Ltd.